The Directorate-General for Energy Policy and Mines has granted administrative authorisation and approved the execution project for the modification of position K 52.1 of the Tarancón-Cuenca-Fuentes pipeline in Belinchón (Cuenca). This modification includes a G-65 metering station intended for biomethane injection by the company Soluciones Totales de Biometano, SL. The resolution was issued following the public information process and the acquisition of mandatory reports (Art. 83 Law 39/2015 and RD 1434/2002).
For Enagás Transporte, the resolution enables the execution of technical expansion works for biomethane integration, making its commissioning conditional upon final recognition by the Government Sub-delegation in Cuenca (point 8.a). For the biomethane producer, Soluciones Totales de Biometano, SL, it formalises the infrastructure required for grid injection. The Government Sub-delegation in Cuenca holds the power of inspection and verification during the execution of the works (point 7.a).