Skip to content
LOW
Tax

Resolución de 9 de enero de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 20 de abril de 2023, por la que se otorga a Line Energy Power, SL, autorización administrativa previa para la instalación fotovoltaica «Line 1», de 51,725 MW potencia instalada y sus infraestructuras de evacuación, en Villalar de los Comuneros (Valladolid).

BOE-A-2026-2540

Prepared and reviewed by the BMC editorial team  ·  Methodology Published 3 Feb 2026, 20:46

Technical details

Type
Resolution (what is this?)
Identifier
BOE-A-2026-2540
Published
3 Feb 2026

Lifecycle

2026-02-03PublishedPublished in the BOE

BMC resources for this provision

Official text Based on BOE data (boe.es). Information, not advice.

Does this provision affect you?

The tax team reviews your specific situation.

Talk to the tax team
This analysis is informational only and does not constitute legal advice or create a client-adviser relationship. BM Consulting.
Email
Contact