Skip to content
LOW
Tax energia

Resolución de 22 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento de Falck Renewables Power 3, SL, de autorización administrativa previa del parque solar fotovoltaico «El Espino de 121,5 MWp/100 MWn» y su infraestructura de evacuación asociada, en Velilla de San Antonio y Loeches (Madrid).

BOE-A-2026-12601

Prepared and reviewed by the BMC editorial team  ·  Methodology

Technical details

Type
Resolution (what is this?)
Identifier
BOE-A-2026-12601
Published
10 Jun 2026

Lifecycle

2026-06-10PublishedPublished in the BOE

BMC resources for this provision

Official text Based on BOE data (boe.es). Information, not advice.

Does this provision affect you?

The tax team reviews your specific situation.

Talk to the tax team
This analysis is informational only and does not constitute legal advice or create a client-adviser relationship. BM Consulting.
Email
Contact