Skip to content
LOW
Tax manufactura

Resolución de 20 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Rolwind Andalucía 10, SL, autorización administrativa previa para el proyecto de almacenamiento energético stand alone «ST Palmosilla», de 200 MW de potencia instalada, y su infraestructura de evacuación, en Tarifa (Cádiz).

BOE-A-2026-12017

Prepared and reviewed by the BMC editorial team  ·  Methodology Published 4 Jun 2026, 17:55

Technical details

Type
Resolution (what is this?)
Identifier
BOE-A-2026-12017
Published
4 Jun 2026

Lifecycle

2026-06-04PublishedPublished in the BOE

BMC resources for this provision

Official text Based on BOE data (boe.es). Information, not advice.

Does this provision affect you?

The tax team reviews your specific situation.

Talk to the tax team
This analysis is informational only and does not constitute legal advice or create a client-adviser relationship. BM Consulting.
Email
Contact