Redexis Infraestructuras: 12 months to build new biomethane injection point in Calatorao

The Directorate General for Energy Policy and Mines has granted administrative authorisation and approved the execution project for a new position on the "Zaragoza-Calatayud" gas pipeline (Art. 5). The project, promoted by Redexis Infraestructuras, SL, will enable the injection of biomethane from the Biored Calatayud, SL plant in the municipality of Calatorao (Zaragoza). The resolution was issued under Hydrocarbons Law 34/1998 following public information procedures and consultations with administrations (Art. 83 Law 39/2015; RD 1434/2002).

In 3 key points

  1. Maximum period of 12 months for construction and request for commissioning, Art. 5 (art. 5.ª)
  2. Failure to meet the construction deadline terminates the administrative authorisation, Art. 5 (art. 5.ª)
  3. Obligation to obtain prior authorisation for any technical expansion or modification, Art. 6 (art. 6.ª)

How it affects those involved

For Redexis Infraestructuras, SL, the resolution imposes the duty to complete construction and request the commissioning certificate within a maximum period of twelve months from notification (Art. 5). Failure to meet this deadline will result in the termination of the administrative authorisation, unless a justified extension is granted (Art. 5). Enagás Transporte, SAU, is authorised to require the promoter to bear the costs of recalibrating metering and odourizing equipment if the injection generates such expenses (source text).

Lifecycle

2026-05-25PublishedPublished in the BOE
Official text Based on BOE data (boe.es). Information, not advice.

Does this provision affect you?

The tax team reviews your specific situation.

Talk to the tax team
This analysis is informational only and does not constitute legal advice or create a client-adviser relationship. BM Consulting.
Email
Contact