The CNMC has modified the parameters of the resolution dated 11 February 2021, which grants special status to the 132 kV submarine energy transmission link between Algeciras (Cádiz) and Virgen de África (Ceuta) (third ruling). This modification allows the project to be included in the remuneration regime for singular investments with special technical characteristics. The measure is conditional upon the technical and economic description being integrated into the upcoming 2025-2030 Electricity Planning and the transmission grid development plans for the 2030 horizon (fourth ruling).
For Red Eléctrica de España, SAU, the resolution validates the modification of the economic and technical parameters of its submarine interconnection project, ensuring its inclusion in the singular investment regime (third ruling). The project must comply with Royal Decree 534/2025 regarding the granting of subsidies from the Recovery, Transformation and Resilience Plan funds. Furthermore, the action is subject to the reporting and inspection obligations set out in CNMC Circular 5/2019 and Informative Circular 4/2021 (seventh ruling).
The tax team reviews your specific situation.