Red Eléctrica de España: modification of parameters for the Tenerife-La Gomera submarine link

The CNMC has amended the parameters of the resolution granting special status to the 66 kV underground-submarine electrical link between Chío (Tenerife) and El Palmar (La Gomera) (Background First). This measure allows the infrastructure to be included in the remuneration regime for singular investments with special technical characteristics (Background Fourth). The modification is subject to the technical and economic description being integrated into the 2025-2030 Electricity Planning and the transmission grid development plans for the 2030 horizon (Background Sixth).

In 2 key points

  1. The resolution shall take effect on the day following its publication in the BOE (Background Eighth). (Antecedentes Octavo)
  2. The modification is conditional upon inclusion in the 2025-2030 Electricity Planning (Background Sixth). (Antecedentes Sexto)

How it affects those involved

For Red Eléctrica de España, SAU, the resolution validates the modification of economic and technical parameters to ensure remuneration for the investment in the submarine link (Background Fourth). The infrastructure is subject to CNMC information and inspection obligations in accordance with Circular 5/2019 and Informative Circular 4/2021 (Background Seventh). The project must align with the 2025-2030 Electricity Planning to maintain its status (Background Sixth).

Lifecycle

2026-07-07PublishedPublished in the BOE
Official text Based on BOE data (boe.es). Information, not advice.

Does this provision affect you?

The tax team reviews your specific situation.

Talk to the tax team
This analysis is informational only and does not constitute legal advice or create a client-adviser relationship. BM Consulting.
Email
Contact