Skip to content
BOE-A-2026-3003 ·9 February 2026 ·Resolution Low impact
Tax

Electrotécnica Arteche Hermanos, SL: authorisation for the installation and use of the UEK-24-G model measuring transformer

The Bizkaia Territorial Delegation has authorised the installation and grid use of the UEK-24-G model inductive voltage measuring transformer manufactured by Electrotécnica Arteche Hermanos, SL. This authorisation was granted following verification of compliance with Royal Decree 1110/2007 and standards UNE-EN 61869-1:2010 and UNE-EN 61869-3:2012. The authorisation is valid throughout the national territory (legal grounds 3).

In 3 key points

  1. The authorisation is valid for five years, renewable for successive equal periods, legal grounds 2.b (fundamentos jurídicos 2.b)
  2. Obligation to obtain a conformity assessment within one year of the entry into force of the specific metrological regulation, legal grounds 2.a (fundamentos jurídicos 2.a)
  3. Equipment must pass initial verification by an officially authorised electrical measurements verifier, legal grounds 2.d (fundamentos jurídicos 2.d)

How it affects those involved

For the manufacturer, this authorisation permits the commercialisation of the UEK-24-G model, subject to the obligation of obtaining a conformity assessment within one year of the entry into force of the specific metrological regulation governing it. Equipment must pass an initial verification by an authorised electrical measurements verifier prior to installation. The authorisation is valid for five years and is renewable (legal grounds 2).

Lifecycle

2026-02-09PublishedPublished in the BOE
Official text Based on BOE data (boe.es). Information, not advice.

Does this provision affect you?

The tax team reviews your specific situation.

Talk to the tax team
This analysis is informational only and does not constitute legal advice or create a client-adviser relationship. BM Consulting.
Email
Contact