Redexis Infraestructuras, SL: 12-month deadline to expand gas pipeline for biomethane injection in Tauste

The Directorate General for Energy Policy and Mines has granted administrative authorisation and approved the execution project for a new connection to the 'Gallur-Tauste-Ejea de los Caballeros' gas pipeline. The project, owned by Redexis Infraestructuras, SL, will enable the injection of biomethane from the Tauste Biometano, SL plant into the primary natural gas transport network. Execution must comply with Industry Law 21/1992 and current technical safety standards.

In 3 key points

  1. Maximum 12-month deadline for facility expansion and commissioning application, Art. 5 (art. 5.ª)
  2. Failure to meet the 12-month deadline results in the termination of the administrative authorisation, Art. 5 (art. 5.ª)
  3. Obligation to obtain prior authorisation for basic technical modifications, Art. 6 (art. 6.ª)

How it affects those involved

For Redexis Infraestructuras, SL, the resolution enables the integration of biomethane into the transport network but imposes a strict twelve-month deadline for the expansion of facilities and the application for commissioning (Art. 5). Failure to meet this deadline will result in the termination of the administrative authorisation, unless a justified extension is granted (Art. 5). The Government Sub-delegation in Zaragoza will retain inspection powers during the works.

Lifecycle

2026-09-11PublishedPublished in the BOE
Official text Based on BOE data (boe.es). Information, not advice.

Does this provision affect you?

The administrative team reviews your specific situation.

Talk to the administrative team
This analysis is informational only and does not constitute legal advice or create a client-adviser relationship. BMC.
Book your free first meeting